Confidential Investment Opportunity

Crypto Forte

100 MW AI & Mining Infrastructure

Asunción, Paraguay

01 / 10

01 — Problem

Global Compute Demand Is Exploding

  • AI training requires massive, sustained GPU capacity
  • Tier-1 data centers in US & EU face energy constraints and rising costs
  • High electricity prices compress operator margins
  • Supply of energy-rich, scalable sites is critically limited
02 / 10

02 — Solution

Infrastructure Where Energy Is Abundant

  • 100 MW facility in one of the world’s cheapest energy regions
  • Hybrid compute: ASIC mining + high-density GPU hosting
  • Low-cost, modular deployment — operational in months, not years
  • Operated by Crypto Forte E.A.S. — registered in Paraguay, est. 2026
03 / 10

03 — Why Paraguay

The Energy Advantage

Sub-$0.04/kWh

Among the lowest electricity rates globally, powered by Itaipu & Yacyreta hydro dams.

Energy Surplus

Paraguay exports over 80% of generated power — no grid congestion, no constraints.

Stable Jurisdiction

Democratic government, investor-friendly regulation, EAS business framework (Ley 6480/2020).

Scalable Land

Industrial land with road access, expandable power connections, room to grow beyond 100 MW.

04 / 10

04 — Infrastructure

Built to Scale

100 MW Substation

Dual independent power lines with redundant switchgear and on-site transformation.

1 Hectare Site

Secured land ready for phased container and building deployment.

Cooling Systems

Air and liquid cooling optimized for high-density GPU and ASIC workloads.

24/7 Security

Physical perimeter, biometric access, surveillance, and fire suppression.

05 / 10

05 — Business Model

Multiple Revenue Streams

$/kW

Mining Hosting

Turn-key ASIC hosting with managed power, cooling, and maintenance. Predictable recurring revenue.

$/hour

GPU Rental

High-performance GPU infrastructure for AI training and inference. Premium pricing, growing demand.

Custom

Private Contracts

Dedicated capacity for institutional clients. Long-term agreements with upfront commitments.

06 / 10

06 — Market

Market Opportunity

  • Global AI compute market projected to exceed $200B by 2028
  • Persistent GPU shortages driving demand for alternative hosting
  • Bitcoin mining hashrate growing — operators seek lowest-cost energy
  • Increasing demand for decentralized, geographically diversified infrastructure
07 / 10

07 — Scalability

Modular Growth Path

  • Phase 1: 10 MW deployment — operational baseline
  • Phase 2: Scale to 50 MW — diversified compute mix
  • Phase 3: Full 100 MW+ capacity — institutional-grade facility

Flexible allocation between mining and AI workloads based on market conditions. Rapid deployment via modular container architecture.

08 / 10

08 — Unit Economics

Why the Margins Work

Lower Energy Cost

Paraguay hydro rates are 3–5x cheaper than US/EU industrial tariffs. This directly translates to higher operator margins on every kW deployed.

Flexible Allocation

Mining generates short-term cashflow. AI hosting captures long-term upside. The ability to shift between both maximizes risk-adjusted returns.

09 / 10

09 — Opportunity

Investment Access

We are opening capacity for strategic partners, infrastructure investors, and long-term contract holders.

Early-stage allocation available.

Direct access to infrastructure capacity, partnerships, and co-investment opportunities.

Crypto Forte E.A.S. — Asunción, Paraguay

cryptoforte.py

This document is confidential and intended solely for the recipient.

10 / 10